Most building owners book an inspection knowing a van turns up and paperwork arrives later. Everything that goes wrong lives in the gap between those two things — so here is the whole of it, step by step, including the parts other contractors would rather you found out on the day.
Most delays are not technical. They are a locked riser room, a gate code that changed, a tenant who was not told, or a key holder on holiday. We ask about all of that in advance and note it against your building so we are not asking again next year.
We check in with whoever is on site, confirm what we are testing, and agree what will make noise and when. Then we walk the building once before touching anything, so we know what is actually there rather than what the last report says is there.
If your system is monitored, we ring the central station and place it on test so a signal does not dispatch the fire department. At the end we take it back off test and confirm signals are being received again.
Every extinguisher gets its gauge, pin, seal, hose and dates checked, and the dates tell us whether a six-year service or a hydrostatic test is coming due. Sprinkler work means valves, gauges, the flow switch, the water supply and a look at heads and pipe condition. Alarm work means initiating devices, notification appliances, batteries and the panel. Each one is recorded as we go, not written up from memory afterwards.
Flow tests and drain tests put water somewhere. Outside, usually — but not always, and in a finished space that matters. We will tell you where it is going before we open anything.
We walk through what we found before we go, in plain words, with photographs of anything that matters. Nothing should be a surprise when the report arrives. If something is genuinely unsafe we will say so on the spot rather than letting it wait for paperwork.
A proper report says what was tested, what passed, what failed, what was photographed, who did it, when, and under what licence. Deficiencies each get a corrective action. If your authority needs a copy, we file it. You get the document whether or not there is any work to quote.
Every interval your building is on — annual, quarterly, three-year, five-year — gets scheduled from the date we were there, not from the date somebody remembers. You are told before it is due rather than after.